Current Projects

NO. Name & Location of plant Plant capacity Start Date Scope of work
1 High & Site Supervision for Installation of Spare T.C. of 5ive Station Installation of Spare T.C. 2016.10 MC & SSC
2 Solvent D- Asphalting (SDA) Plant MC Project- Esfehan 2016.05 MC
3 Amir Kabir Petrochemical Revamp (Tankage System) 2016.04 EP+Supervision on C
4 Conceptual Study of Kian Petrochemical Complex - 2016.01 Conceptual Study (partnership with Axens)
5 Farzanegan Gas Condensate Refinery, Assaluyeh 10,000 BPD /(40,000 BPD) 2015.09 Basic Design /(Conceptual Study)
6 ILAM Sulfur Removal Unit, Ilam 453/328 KTPAC3, 470/392 KTPAC5 2015.09 EPCC
7 Utility & Offsite of Kangan Petropalayesh Complex (Tombak near Assaluyeh) Steam, Cooling & Desaltation water, Nitrogen , Instrument Air 2015 Conceptual/Basic Design/Detail Design
8 C2 Recovery and Fractionation Plant, South Pars Phase 12, kangan (Tombak, near Assaluyeh) 2050 (ton/hr) Methane, 217 (ton/hr) Ethane, 122 (ton/hr) Propane, 63 (ton/hr) Butane, 25 (ton/hr) C5+ 2014 Endorsement of the carried out Basic Design; Performance of Detail Engineering, Procurement Engineering Services, Technical Services and Assistance during Construction, Pre-Commissioning, Commissioning and Start Up
9 SIRAF Condensate Refinery (tombak, near Assaluyeh) 8 Refineries of 60,000 BPD 2015.3 Basic Design + EPC Tender Package (12 Months) - Basic Design (4 months from 2016.03 - with TOYO)
10 Gas sweetening Unit & Ethane Recovery 324 MMSCFD 2012 Basic Design Review, Detail Design, Procurement Engineering Services, Field Engineering Services
11 NGL 3200 (Plant & Pipeline) 2014 MC & SSC
12 West Karoon Oil Fields Early Production Units (Arvandan) 165,000 BPD 2011 EPC
13 NGL 3100 (Plant & Pipelines) 270 MMSCFD 2012 Basic Design Endorsement, Detail Design, Procurement Engineering Services, Field Engineering Services
14 Custody Transfer Metering & Centralised Monitoring 70 points in whole country 2012 MC & SSC + Basic Design of part of metering points
15 South Pars Gas Field Development Project – Phases 20 & 21, Assaluyeh 2 x 1,000 MMSCFD Natural Gas, 2 x 40,000 bbls/D Condensate 2010 Basic Design Review, Detail Design, Procurement Engineering Services, Field Engineering Services
16 South Pars Gas Field Development Project – Phases 17 & 18, Assaluyeh 2 x 1,000 MMSCFD Natural Gas, 2 x 40,000 bbls/D Condensate 2010 Detail Design, Procurement Engineering Services, Field Engineering Services
17 200 Turbo Compressors 100 TC's by OTC, 100 TC's by MAPNA 2010 MC & SSC
18 Bid Boland-II Refinery feed Supply 1,800 MFCPD 2011 MC & SSC
19 Mahshahr Oil Product Terminal Revamp 6 jetty/34 Loading Arm, 12,000,000 Barrel Fuel Oil Storage Tanks, 500,000 Barrel Gasoline Storag Tanks 2012 MC & SSC