Utility & Offsite of Kangan Petropalayesh Complex (Tombak near Assaluyeh)

Kangan Utility & Offsite

Kangan Petro-Refinery Complex (KPRC) located in Kangan (Bushehr Province) is designed to recover Ethane, Propane, Butane and C5+ from rich gas supplied throughout a pipeline from South Pars Gas Condensate Field Development Phase 12 with subsequent return of lean residue gas (mainly methane) to existing facilities of Phase12 for injection into IGAT #6.

Kangan Petro-Refinery Company (KPRC) planned to export of propane, butane and C5+. However, further processing of ethane has been planned to produce ethylene (Olefin Plant, 1300 ktpy), PE (Poly Ethylene, 750 ktpy), LDPE (Low Density Poly Ethylene) and MEG (Mono Ethylene Glycol, 550 ktpy). Moreover, all infrastructure and utilities required for process plants of the Complex should be established within overall plot plan.

Kangan Petro-Refinery Complex (KPRC) is planned to be constructed progressively from Phase1 where a C2+ Recovery and Fractionation Plant (CRFP) is constructed with corresponding utilities and offsite. Design of utility and offsite sections in KPRC should be consistent with progressive construction of the Complex.

 

Kangan Petro-Refinery Complex (KPRC) Utility & Offsite includes following units:

·         Air System

·         N2 Generation System

·         Steam Generation  System

·         Fuel Gas/Fuel Oil Systems

·         Cooling Water System

·         Sea Water Intake and Outfall System

·         Sea Water Treatment System

·         Waste Water Treatment System

·         Interconnecting & off plot 

 

The Contractor’s Scope of WORK includes Conceptual Design of utility units for whole of complex, Basic & Detail Engineering of C2 recovery plant related utility units including design of common parts , Procurement Services and Assistance during Construction, Pre-Commissioning, Commissioning and Start Up.

 

Kangan Petro-Refinery Complex (KPRC) Utility & Offsite includes following units:

·         Air System

·         N2 Generation System

·         Steam Generation  System

·         Fuel Gas/Fuel Oil Systems

·         Cooling Water System

·         Sea Water Intake and Outfall System

·         Sea Water Treatment System

·         Waste Water Treatment System

·         Interconnecting & off plot 

 

 

The Owner is Kangan Petro Refining Company (KPRC) .The Contract duration is 24 months from its Effective Date.