Current Project

A complete list of current projects by EIED is tabulated below:
No Name of the Owner Scope of the Project Location Company’s Scope of Work Plant Capacity/ Description Start
1 Oil Industries Engineering & Construction (OIEC) Olefin Plant Dehloran Basic & Details Engineering & Procurement Engineering Services 2018,07
2 Kangan PetroPalayesh Complex (KPRC) Olefin Plant Kangan Engineering & Procurement Engineering Services 2018,07
3 Ghadir Petrochemical Co. Engineering Services Mahshahr Engineering & Procurement Services 2018,04
4 SINA Energy Development Co. (SEDCO)  C2+ Recovery Assaluyeh Conceptual Design  – 2018,03
5 Karoon Petrochemical Company (KRNPC) CO, H2 Generation Plant HYCO Mahshahr EPC 35,000 MTPY Co 8,000 MTPY H2 2018,02
6 National Iranian South Oil Company (NISOC) Phase I of Revamp & Reconstruction of Surface Facilities. Khozestan Data Gathering for Subsequent Conceptual Design Multiple Facilities 2018,02
7 Bandar Imam Petrochemical Company (BIPC) Second Ethan Recovery & Olefin Plants and Off-site Bandar Emam Basic & Detail Design 3078 MTPD 2018,02
8 Arya Sasol Polymer Company(Persia Group) Olefin Plant De Bottlenecking & Capacity Increasing Assaluyeh Basic & Detail Design 1,000,000 TPY 2018,02
9 Iranian Gas Engineering & Development Co. (IGEDC) Detail Engineering, Procurement & Construction Kheyrgu EPC 110 MMSCMD 2017
10 Amir Kabir Petrochemical Complex (AKPC) Revamp of Tankage System Mahshahr Basic Design 2016
11 Ilam petrochemical Complex (ILPC) Sulfur Removal Unit (SRU) Ilam EPCC 328000 T/Y C3+392000 T/Y C5+ 2015
12 Kangan PetroPalayesh Complex (KPRC) Utility & Offsite Tonbak (near Assaluyeh) Conceptual & Basic Design, Detailed Engineering, Procurement Engineering Services, Technical Services and  Assistance 2015
13 Kangan PetroPalayesh Complex (KPRC) C2 Recovery and Fractionation Units Tonbak

(near Assaluyeh)

Endorsement of Basic Design, Detailed Engineering, Procurement Engineering Services Technical Services and  Assistance 3,000 MMSCFD 2014
14 Oil Industries Engineering Co. (OIEC) NGL 3100 Dehloran Basic Design Endorsement, Detail Design Procurement  Engineering Services Field Engineering Services 270 MMSCFD 2012
15 Bushehr Petrochemical Complex (BUPC) Gas sweetening & Ethane Recovery Units Assaluyeh Basic Design Review, Detail Design Procurement  Engineering Services Field Engineering Services 324 MMSCFD 2012
16 Arvandan Oil & Gas Company (AOGC) West Karoon Oil Fields Early Production Unit West Karoon EPC 165,000 BPD 2011
17 Persian Gulf & Petro Industries Co. (PGPIC) NGL 3200 Khouzestan MC & SSC 2014
18 Ministry of Petroleum (MOP) & PEDEC (Basic of Phase 4) Custody Transfer Metering & Centralized Monitoring (Phase 4) Various Locations MC/SSC + Basic Design 70 Points in Whole Country Including: Crude Oil Production Unit Gas Refineries Oil Export/ Import Jetties NGL Plants 2012
19 Pars Oil & Gas Company (POGC)/ OIEC South Pars Gas Field  Development – Phases 20&21 Assaluyeh Basic Design Review, Detail Design, Procurement Engineering Services, Field Engineering Services 2×1,000 MMSCFD Natural Gas

2×40,000 BBLS/D  Condensate

2010
20 Pars Oil & Gas Company (POGC)/ OIEC LPG Polishing South Pars Gas Field  Development – phases 20&21 Assaluyeh Basic & Detail Engineering, FEED Study, Procurement 2011
21 National Iranian Oil Engineering & Construction Company (NIOEC) Mahshahr Oil Product Terminal Revamp Mahshahr MC 6 jetty/34 Loading Arm 12,000,000 Barrel, Fuel Oil Storage Tanks 500,000 Barrel, Gasoline Storage Tanks 2012
22 Iranian Gas Engineering and Development Company (IGEDC) 200 Turbo Compressors Various Locations MC & SSC

(Services for Supply & Fabrication)

100 TC’s by OTC 100 TC’s by MAPNA 2008
23 National Iranian South Oil Company (NISOC) Bid Boland-II Refinery feed Supply Behbahan MC & SSC 1,800 MFCPD 2011