1
|
Dehloran
Gas Compressor Station
|
–
|
2018-2019
|
Iranian Central Oil Fields Co. (ICOFC) / OIEC
|
FEED and EPC Tender Package
|
2
|
Hormoz Olefin Basic Design,
Assaluyeh
|
Olefin Plant
1,300,000 T/Y
|
2020-2022
|
Persian Gulf Hormoz Petrochemical Co.
|
Basic Design
|
3
|
C2 Recovery and Fractionation Plant- Kangan (Tonbak)
|
3.000MMSCFD / 2050 (ton/hr.) Methane,
/ 217 (ton/hr.) Ethane, / 122 (ton/hr.) Propane, / 63 (ton/hr.)Butane
/ 25 (ton/hr.) C5+
|
2014-2020
|
Kangan Petro Refining Co. (KPRC)
|
Basic Design
Endorsement, Detail Design, Procurement Engineering Services Technical Services and Assistance
|
4
|
Kangan Olefin Field Engineering Services- Kangan
|
–
|
2017
|
Kangan Petrochemical Development Co. (KPRC)
|
FES
|
5
|
Amir Kabir Petrochemical Revamp Project- Bandar Imam
|
–
|
2017
|
Amir Kabir Petrochemical Co. (AKPC)
|
asic Design
|
6
|
Increasing Production of 27 Gachsaran Reservoirs – Khuzestan
|
–
|
2018-2020
|
National Iranian South Oil Company (NISOC)
|
Data Gathering and EPC tender package preparation
|
7
|
Kish Gas Field Development Phase 1
|
–
|
2019-2020
|
Pars Oil & Gas Company (POGC) / OIEC
|
Conceptual Design
|
8
|
Iran LNG Appraisal – Kangan
|
2 x 1000 MM SCFD
|
Apr 2019- Sep 2019
|
Iran Liquified Natural Gas Co.(ILC)
|
Conceptual and Feasibility Study
|
9
|
Second Ethan Recovery & Olefin Plant of BIPC- Bandar Emam
|
1000 KTA of Ethylene
|
2018
|
Bandar Imam Petrochemical Company (BIPC)
|
EPCCF
|
10
|
Olefin Plant capacity increasing and De-Bottlenecking- Assaluyeh
|
1,000,000 TPY
|
2018-2019
|
Arya Sasol Polymer Company
|
Basic Completion & Detail Design, Procurement Engineering Services
|
11
|
Sulfur Removal Unit (SRU)- ILAM
|
328000 T/Y C3+ / 392000 T/Y C5+
|
2015-2020
|
Ilam petrochemical Co. (ILPC)
|
EPCC
|
12
|
Equipping Transaction Points of Petroleum Industry with Custody
Transfer Metering & Monitoring System Phases 1 & 2- /
(13 Points in Whole Country Including: Crude Oil Production Unit,
Gas Refineries, Oil Export/ Import Jetties)
|
–
|
2019
|
Petroleum Engineering and Development Co. ( PEDEC)
|
Re- Basic & EPC Tender Package
|
13
|
South Pars Gas Field Development
Phases 20 & 21 (Assaluyeh)
|
2×1,000 MMSCFD Natural Gas / 2×40,000 BBLS/D
Condensate
|
2010-2019
|
Pars Oil & Gas Company (POGC) / OIEC
|
Detail Design, Procurement Engineering Services, Field Engineering
Services
|
14
|
Kheirgoo Gas Compressor Station EPC Project – (Kheirgoo)
|
110 MMSCMD
|
2017- 2019
|
Iranian Gas Engineering & Development Co ( NIGC)
|
EPCC
|
15
|
Gas Sweeting & C2 Recovery Units (Assaluyeh)
|
324 MMSCFD
|
2012-2019
|
Bushehr Petrochemical Co (BUPC)
|
Basic & Detail Design Procurement Engineering Services Field
Engineering Services
|
16
|
West
Karoon Oil Fields Production Units – (Ahvaz- Jofeir)
|
165.000
BPD
|
2011-2019
|
Arvandan
Oil & Gas Co (AOGC)
|
EPCC
|
17
|
Custody
Transfer Metering & Centralized Monitoring (Phase 1&2)-Various
Location
|
13 Points
in whole Country Including , Crude Oil Production Unit, Gas
Refineries , Oil Export / Import Jetties
|
2012-2019
|
Petroleum
Engineering & Development Co.(PEDEC)13
|
Data Gathering, Basic Design,
EPC Tender Documentation
|
18
|
Mahshahr
Oil Product Terminal Revamp – (Mahshar)
|
6 Jetty/
34 Loading Arm 12.000.000 Barrel, Fuel Oil Storage Tanks 500.000
Barrel , Gasoline Storage Tanks
|
2012-2019
|
National
Iranian Oil Engineering & Construction Co. ( NIOEC)
|
MC
|
19
|
Bid Boland – II Refinery Feed Supply (Khoozestan)
|
1.800 MMSCFD
|
2011-2019
|
Iranian
South Oil Company (NISOC)
|
MC & SSC
|
20
|
Data Gathering Project – Phase I. (For Performing Subsequent
Conceptual Design)- khozestan
|
Multiple Facilities
|
2018-2019
|
National Iranian South Oil Company (NISOC)
|
Data Gathering for Subsequent Conceptual Design
|
21
|
C2+ Recovery – (Asaluyeh)
|
–
|
2018-2019
|
SINA Energy Development Co. (SEDCO)
|
Conceptual Design
|
22
|
Varavi, Homa Gas Compressor stations & and Tabnak Separation Center
(Lamrd- Fars)
|
Homa 18 MMSCMD / Varavi 11 MMSCMD / Tabnak 36 MMSCMD
|
2018-2019
|
Iranian Central Oil Field Company (ICOFC)
|
Basic Design Review & Tender Document Preparation
|
23
|
LPG Polishing of South Pars Gas Field Development – Phases 20&21 /
Assaluyeh
|
2016 MMSCMD Butane / 4176 MMSCMD Propane
|
2011-2018
|
OIEC
|
Basic & Detail Design & Procurement Engineering Services
|
24
|
5 Stations T.C. re-Installastions Qazvin/Khoramdare, Parchin, Semnan
Nizar Qom 3
|
5 Stations Gas Compressor
|
2016-2018
|
Iranian Gas Engineering & Development Co. (IGEDC)
|
Management & Site Supervision for Installation of Spare T.C. of five
Stations
|
25
|
Condensate Refinery Farzanegan.
P. S.E. Z (Asaluyeh)
|
40,000 BPD
|
2015-2018
|
Farzanegan Fars Nikoo Group
|
Basic Engineering Design
|
26
|
SIRAF Condensate Refinery
|
8 Refineries of 60,000 BPD
|
2015-2018
|
SIRAF Condensate Refineries
|
Basic Design (Cooperation with TOYO after 2016.03)
|
27
|
PDH Kangan
|
–
|
2017-2018
|
Oil Industries Engineering Co. (OIEC)
|
Feasibility Study
|
28
|
South Pars Gas Field Development – Phases 17&18 Assaluyeh
|
2×1,000 MMSCFD Natural Gas
2×40,000 BBLS/D Condensate
|
2006-2016
|
Pars Oil & Gas Company (POGC)/ OIEC
|
Basic Design Review, Detail Design, Procurement Engineering
Services, Field Engineering Services
|
29
|
Kian Petrochemical Complex
Assaluyeh
|
1395 KTPA Aromatic &
2236 KTPA Olefin
|
2016-2017
|
Kian Petrochemical Company
|
Conceptual Study
(Cooperation with Axens)
|
30
|
North-Northeast Six Gas Compressor Stations
|
58, 57, 54, 52, 30, 30 MMSCMD
|
2007-2017
|
IGEDC
|
MC & SSC
|
31
|
Heavy Oil Refinery Production and Lights Bitumen
|
1000000 TN Bitumen
|
20152017
|
IPMI
|
Feasibility Study
|
32
|
TGTU of South Pars Gas Field Development– Phases 2 & 3, Assaluyeh
|
2 ´ 130 Ton/day, Liquid sulphur from acid gas TGTU 95% to 99.7%
efficiency
|
2012
(Hold by Owner)
|
Pars Oil & Gas Company (POGC)
|
EPC
|
33
|
Tabriz Refinery Gasoline Production Plant, Tabriz
|
20,000 BPSD
|
2007-2013
|
Tabriz Oil Refinery Co.
|
EPCC, Partnership with SEI (China), Construction with TANAVOB
|
34
|
Ilam HDPE Plant, Ilam
|
300,000 t/y, HDPE
|
2004-2013
|
Ilam Petrochemical Company
|
EPCC, Partnership with MES (Japan)
|
35
|
Mahshahr Jetty No.2
|
–
|
2008-2010
|
Mahshahr, Petrochemical Special, Economic Zone, Management
|
MC & SSC
|
36
|
Hormoz Heavy Oil Refinery
|
300,000, BBL/D
|
2008-2012
(Hold by Owner)
|
NIOEC
|
EPC (as amember of consortium), Part of Utility & Offsite unites
|
37
|
Tehran Refinery Products Quality Upgrading Plant
|
80,000 BBL/D,
De-sulfurization
|
2007-2012
|
NIOEC
|
MC & SSC
|
38
|
Pars Polystyrene Plant, Assaluyeh
|
250, 000 t/y, Polystyrene
|
2005-2008
(Hold by Owner)
|
Pars Petrochemical, Company
|
EPCC, Partnership with Simon Carves (UK)
|
39
|
Sirri Island, Gas Gathering & NGL Recovery
|
50 MMSCFD Natural Gas, 6,900 BPD Propane, 3,750 BPD Butane, 3,180
BPD Condensate
|
2004-2007, (Engineering)
|
IOOC/NIOC
|
Basic Design Review, Detail Design, Procurement Engineering
Services, Field Engineering Services
|
40
|
Bid Boland II Gas Processing & Pipiline
|
57 MMSCMD
|
2007-2012
|
IGEDC
|
MC & SSC
|
41
|
Day & Sepid Zakhur, Gas Field Development
|
–
|
2009-2011
|
ICOFC
|
MC & SSC
|
42
|
Khuzestan Extra Heavy Crude Oil Refinery
|
180,000, BPSD
|
2008-2009
|
NIOEC
|
Basic Design
|
43
|
Darquain Oil Field Development-Phase 2
|
2 ´ 55000, BPSD
|
2007-2009
|
PEDEC
|
MC & SSC
|
44
|
South Pars Gas Field Development Project, Phases 9 & 10, Bandar
Assaluyeh
|
2 ´ 1,000 MMSCFD Natural Gas
2 ´ 40,000 BBLS/D Condensate
|
2004-2008
|
Pars Oil & Gas Company (POGC)
|
FES, Field Engineering Services
|
45
|
South Pars Gas Field Development Project – Phases 9 & 10, Assaluyeh
|
2 ´ 1,000 MMSCFD Natural Gas
2 ´ 40,000 BBLS/D Condensate
|
2003-2006
|
Pars Oil & Gas Company (POGC)
|
Detail Engineering and Procurement Engineering Services, As
Engineering Sub-Contractor of OIEC
|
46
|
Qom-III Gas Compressor Station
|
90 MMSCMD
|
2004-2006
|
NIGC
|
Complete Basic Design, Detail Engineering and Engineering Services
of Procurement
|
47
|
Four Gas Compressor Stations – North West
|
4 ´ 60 MMSCMD
|
2006-2007
|
NIGC
|
SSC, Site Supervision Contractor
|
48
|
Six Gas Compressor Station
|
87,87,90,90, 90,160 MMSCMD
|
2002-2005
|
NIGC
|
SSC, Site Supervision Contractor
|
49
|
Consulting Services To “MATN”
|
–
|
2005-2006
|
PEDEC, “MATN”
|
Consulting Engineering Services
|
50
|
Acetic Acid Plant, Mahshahr
|
150,000 t/y, Acetic Acid
|
2003-2006
|
Fanavaran, Petrochemical Company
|
FES (Field Engineering Services)
|
51
|
7th Olefin Plant, Mahshahr
|
1,100,000 t/y, Ethylyne
200000 t/y propylene
|
2001- 2005
|
Maroun Petrochemical Company (MPC)
|
SSC, Site Supervision Contractor
|
52
|
4th Aromatic, Bandar Assaluyeh
|
750,000 t/y Paraxylene
|
2002-2005
|
Borzuyeh Petrochemical Company (BPC)
|
MC, Partnership with Foster Wheeler
|
53
|
Petrochemical Storage Facilities
|
Lots of and facilities Storage Tanks
|
2004-2005
|
PIDMCO
|
FES, Field Engineering Services
|
54
|
Six Gas Compressor Stations
|
87, 87, 90, 90,90, 160 MMSCMD
|
2002-2004
|
NIGC
|
Complete Basic Design, Detail Engineering and Engineering Services
of Procurement
|
55
|
Acetic Acid Plant, Bandar Imam
|
150,000 t/y Acetic Acid
|
2001-2004
|
Fanavaran Petrochemical Company
|
Detailed Engineering, Procurement and Technical Assistance Services,
29Partnership with GS
|
56
|
Petrochemical Storage Facilities, Bandar Imam
|
Lots of and facilities Storage Tanks
|
2002-2004
|
PIDMCO
|
Complete Basic Design, Detail Engineering and Procurement Services
|
57
|
7th Olefin Plant, Mahshahr
|
1,100,000 t/y, Ethylene
200,000 t/y, Propylene
|
2000-2004
|
Marun Petrochemical Company (MPC)
|
Detailed Engineering, Procurement
Partnership with Linde
|
58
|
NGL 1300
|
180, MMSCFD, of Feed Gas
4400 BBIS/D, of Condensate Product with Transfer Pump Stations &
Pipeline
|
1999- 2003
|
NPC
|
Detailed Design, Procurement Services, Pre-Comm. & Commissioning
Supervision
|
59
|
NGL 1200
|
260, MMSCFD, Of Feed Gas
Condensate Product with Transfer Pump Stations & Pipeline
|
1999- 2003
|
NPC
|
Detailed Design, Procurement Services, Pre-Comm. & Commissioning
Supervision
|
60
|
Turkmenbashi Refinery Gasoline unit
|
MSCC, LPG & Gasoline
Merox Units 24,000, BPSD Gasoline
|
1999-2000
|
NIOEC
|
Detail Design, and Procurement, Services
|
61
|
6th Olefin Plant, Mahshahr
|
520,000 t/y, Ethylene
154,000 t/y, Propylene
|
1998- 2003
|
Amirkabir Petrochemical Company (AKPC)
|
Detailed Engineering , Procurement & Field Engineering Services,
60Partnership with Linde
|
62
|
Noor Abad Gas Compressor Station
|
86, MMSCMD
|
2001-2003
|
OIEC/NIGC
|
Complete Process Basic Design, and Detail Design
|
63
|
S3 & S6 Gas Compressor Stations
|
90MMSCMD, For S3 station, & 62MMSCMD for S6 Sstation
|
2000-2002
|
NIGC
|
Basic Design for Civil & Structural Discipline and Complete Detail
Engineering
|
64
|
Norooz Oil Field Master Development Plan
|
Altern.A 90,000 BFPD Altern
B 120,000 BFPD
|
1998-1999
|
Repsol Exploration
|
Pre- Basic Design, for the total Surface Facilities
|
|
65
|
South Pars Gas Field Development Phase 1, Stage 2
|
–
|
1997-1998
|
PEDEC
|
Detailed Design
(Terminated At 50% Progress)
|
66
|
Norooz Oil Field Renovation the Persian Gulf
|
Offshore & Onshore 90,000 BBL/D
|
1997-1998
|
NIOC Offshore
|
Extended Basic Design
|
67
|
Khangiran Gas Treating Plant Phase II, Khangiran
|
Two GTU One SRU & Utility Expansion
|
1996-1999
|
NIGC
|
Basic Design Review, Detailed Design, Procurement Services &
Technical Support
|
68
|
NGL-600
|
–
|
1996-1998
|
DICE
|
Supervision of Plant Installation
|
69
|
Gachsaran Gas Treating and Injection, Gachsaran
|
–
|
1995-1998
|
NIOC
|
Basic Design Review, Detailed Design, Procurement Services &
Technical Support
|
70
|
Tehran Refinery Waste Water Treatment
|
–
|
1995-1998
|
Tehran Refinery
|
Optimization Study
|
71
|
Sarkhun II Gas Refinery Gas Sweetening Unit 1000
|
–
|
1995-1998
|
NIGC
|
Basic & Detailed Design Technical Assistance
|
72
|
Tabriz Petrochemical Complex, Tabriz
|
HVAC Engineering
|
1995-1998
|
Tabriz Petrochemical Complex
|
Detailed Design and Procurement Services
|
73
|
Iran Gas Europe Altern. A LNG Altern. B Pipeline, Iran- Europe
|
A:10 LNG Trains each 2.5 million t/y, B: 35 bncm/ySales Gas
|
1995-1996
|
Linde
|
Feasibility Study
|
74
|
ISO Standards Translation
|
–
|
1995-1996
|
Plan & Budget, Organization
|
Translation of 137 ISO Standards in to Farsi
|
75
|
Norooz Oil Field Living Quarters, the Persian Gulf
|
–
|
1995-1996
|
NIOC- offshore
|
Basic Engineering
|
76
|
Master Development Plan for Kharg, Siri, Lavan Islands, & Bahregan
Oil Centre, the Persian Gulf
|
–
|
995-1996
|
NIOC- offshore
|
Engineering
|
77
|
Foundation of Drilling Rigs, Kharg Island
|
–
|
1995-1996
|
NIOC- Offshore
|
Engineering & Tech. Support
|
78
|
1.33 Million Barrel Crude Oil Storage Tank, Kharg Island
|
1.33 Million Barrel Crude Oil
|
1995-1996
|
NIOC-Offshore
|
Engineering
|
79
|
Dorood Oil Field Development in the Persian Gulf
|
–
|
1995-1996
|
NIOC- Offshore
|
Engineering & Tech. Support
|
80
|
Arak Lube Oil Arak
|
–
|
1995
|
Bonyad Mostazafan
|
Feasibility Study
|
81
|
NGL 1200 &1300 Plants, Gachsaran Bibi Hakimeh
|
–
|
1995
|
NIOC- Onshore
|
Preliminary Engineering Study
|
82
|
Pakistan Iran- Pak Refinery
|
–
|
1995-1996
|
NIOC- PERAK
|
Engineering, Preparation of Tender Document
|
83
|
South Pars Gas Field Development (phase-1)
|
–
|
1995-1997
|
PEDEC
|
Conceptual Study & Basic Design
|
84
|
Tehran Refinery, Tehran
|
Modernisation of Control Systems,
|
1995
|
Tehran Refinery NIOC
|
Basic Design & Optimization Study
|
85
|
Furfural Unit, Tehran Pars Oil Refinery, Tehran
|
–
|
1994 -1996
|
Pars Oil Company
|
Contribution in Detailed Design (Renovation & Capacity Increase)
|
86
|
Aromatic Unit, Bandar Imam Petrochemical Company, Bandar Imam
|
–
|
1994-1998
|
BPC
|
Site Activities, Supervision, Technical Services, Field Engineering
& Engineering support
|
87
|
Esfahan Pipeline River Crossing Bridges Karoon, Jarahi, Zayandehrood
River
|
–
|
1994-1997
|
NIOC
|
Design Of Bridges & River Crossing (Basic & Detailed Design)
|
88
|
Sarkhun Pump Station
|
12,000, BBL/D
|
1993-1998
|
NIGC
|
Basic and Detailed Design Engineering & Technical Assistance
|
89
|
Ahwaz Pipeline Facilities Pump Station for Mile 40 Ahwaz & Tabriz
Pipeline, Pump Station for Tabriz-Sarab-Ardabil Pipeline
|
Technical Service (200,000 BBL/D)
Technical Service (35,000 BBL/D)
|
1993-1995
|
NIOC
|
Basic and Detail Design Engineering & Procurement Services, Basic
and Detailed Design Engineering & Procurement Services
|
90
|
Esfahan Polyacryle Complex, Esfahan
|
Air Pollution Control & Recovery System Optimization of Monomer in
Polyacryle Co.
|
1992-1993
1994-1998
|
Iran Polyacryle Company
|
Basic and Detailed Engineering.
|
91
|
Khoramabad Nyl-Iran Tire Production Co., Khoramabad
|
–
|
1992-1993
|
Bank of Industry and Mines of Iran
|
Optimization Study for the Use of Nylon Fibbers in the Tire Industry
|
92
|
Tehran Planning & Information System Design
|
Management Services
|
1992-1994
|
Hormozgan Cement Co.
|
Design and Development of Project Planning and Controlling System
|
93
|
Pakistan/Iran Pak Refinery
|
–
|
1992-1993
|
ABB Lummus Crest (Germany)
|
Feasibility Studies
|
94
|
9th (Condensate) Refinery, Bandar Taheri
|
70,000 BBL/D, DCS Control, The Refinery Includes DEA Gas Treater
|
1991-1993
|
NIOC
|
Complete Basic Design of Condensate Refinery
|
95
|
Khorasan Petrochemical Complex, Bojnurd, Khorasan
|
–
|
1990-1991
|
Khorasan Petrochemical Complex
|
Consultancy Services for the Entire Complex
|
96
|
Esfahan Petrochemical Complex, Esfahan
|
7,500 BPD
|
1990-1991
|
Esfahan Petrochemical Complex
|
Basic & Detailed Design of Feed Facilities
|
97
|
Arak Refinery, Arak
|
21,600 BPD, DCS Control
|
1990-1991
|
TPL, Italy
|
Detailed Design NHT/CCR Platformer Units
|
98
|
L.A.B Complex, Esfahan
|
12,000 BPD
|
1988-1991
|
Iran Chemical Industries Investment Company
|
Basic & Detailed Engineering of Feed facilities Design
|
99
|
Iranian Petroleum Standards (IPS)
|
Preparation of Standards in all Related Fields For the Ministry of
Petroleum
|
1988-1996
|
NIOC
|
398 Standards With More Than 20,000 Pages in 12 Work Disciplines
|
100
|
Bandar Abbas Refinery, Bandar Abbas
|
Two Separate Trains, each 116,000 BBL/D Vacuum Unit Capacity 63,000
BBL/D
|
1988-1990
1990-1997
|
Snamprogetti Italy
|
Basic & Detailed Design of Vacuum & Atmospheric Distillation Unit
|